Loss bonus
- Extension for three months (July 2021 – September 2021)
- Removal of the advance on Fixed‑cost Grant II – the loss bonus now consists solely of the bonus as compensation for the loss of turnover
- Eligibility criterion: 50% loss of turnover (previously 40%)
- Adapted replacement rate: instead of the previous 15% (or 30% including the advance on the FKZ II) the replacement rates are now tiered according to sector‑specific gross profit (10%, 20%, 30% and 40%)
- Cap at EUR 80,000 per month (instead of EUR 30,000 previously)
- Additional joint cap with short‑time work: loss bonus and short‑time work may not together exceed the turnover of the comparison period.
- Extension by six months (July – December 2021)
- Eligibility criterion: 50% loss of turnover (previously 30%)
- Cap: EUR 10 million (subsidy‑law framework)
- Extension for three months (July – September 2021)
- Eligibility criterion: 50% drop in turnover or inability to cover ongoing costs
- Amount: EUR 600 (instead of EUR 1,100 previously, including comeback bonus and additional bonus) – maximum EUR 2,000
- Period: from 1 July 2021 (for 15 June to 30 June 2021 an automatic replacement is provided)
- Application period: until the end of October 2021
- The existing provisions of short‑time work Phase 4 essentially apply
- Minimum working time 30%, with exceptions possible for lower levels
- Turnover decline of at least 50% (third quarter 2020 compared with third quarter 2019).
- The special arrangement is limited until the end of 2021.
- This short‑time work model replaces the pre‑COVID regular short‑time work model, which naturally primarily targeted industry during short‑term fluctuations:
- Discount of 15% from the previous subsidy level
- Net replacement rates for the employee remain unchanged.
- Minimum working time 50% (with case‑by‑case exceptions)
- Compulsory use of one week of holiday for each (started) two‑month period of short‑time work.
- Staff reductions between short‑time work phases are facilitated